How long does the sanding/finishing process take?

Normally sanding & finishing is a three step process that can take as little as 3 days up to 6 days, depending upon drying conditions.

1.) Sand- Firstly we sand the floor down to bare wood to remove most blemishes such as dents, stains, scratches and of course the old finish.

2.) Stain/sealer- If a stain color is desired we apply it at this stage or we just apply the wood sealer on Natural floors.   24 hours of dry time is required before sealer coat on stained floors.

3.) Finish-  the last step is Two Coats of Finish grade polyurethane that must dry between coats, we usually allow 24 hours dry time in between coats to achieve proper curing.

We offer both oil-based and water-based polyurethanes.